The construction of the blending line continues

The heavy pieces are lifted up to the 6th floor and assembled to 2 silos that cross the building from top to bottom. In the movie below you can see how this looks from above.
The heavy pieces are lifted up to the 6th floor and assembled to 2 silos that cross the building from top to bottom. In the movie below you can see how this looks from above.
To avoid damaging the gates and thus safeguarding the entire front of the possible serious consequences, we have installed gate protectors. Two lines were applied on the ground to help the trucks to stay on the right path.